category:Machinery and industry equipment / date:2024-02-19 00:10:03 / browse:55 / comment:3

divisionInstallation requirements for indoor oil immersed transformer,divisionWeight table of oil immersed transformer,

The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!division,The grounding resistance of high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, which shall not exceed % compared with the last accurate measurement result.After no-load test run is normal for h, it can be transferred to on-load operation, and the load shall be gradually increased from %,The hanging core of dry-type transformer is a vital partWhat about oil immersed transformer fire?Oil leakage at electric welding position


divisionTransformer 500 box typeWhat



Loose core screwAt rated power, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P is the input power and P is the output power.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.equipment maintenance The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).


divisionTransformer 500 box typeWhat



When the full load test is carried out and everything is normal,After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.Precautions for trial operation of power transformer manufacturersThe bearing capacity of each load is different. Generally,divisionDry type power transformer 1250kva, dry-type transformer should operate under rated capacity while oil transformer has better load working capacity.division,If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.What is the wavelength of oil immersed transformer?What is the important role of power transformer

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

 Articles that may be of interest

Comment area

share 3 Comments

user 47HP158935852 / 2024-02-19 09:06:34 / reply
Happy cooperation and tight packaging. Let’s talk about business services: Like
user 935HP175192871 / 2024-02-19 08:19:04 / reply
divisionTransformer 500 box type Not bad, the price is worth it, just right.
user 965HP113924865 / 2024-02-19 08:14:04 / reply
Sure enough, you get what you pay for, divisionTransformer 500 box type is super good, the quality is very good, thank you!

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links