The grouting mechanism includes filling grouting, infiltration grouting,Pat ZunGrouting pipe, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.
Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section, and its main purpose is to check the slurry stop effect of the slurry stop pipe head, install and lower the grouting pipe, grout stop plug,Pat ZunSeamless pipe, mixer and other facilities in the hole.Pat ZunPrecision tubeThe trend fluctuates and depends on guessing every day,2023-02-1312:14:13● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.
The grouting mechanism includes filling grouting, infiltration grouting,Pat ZunSteel pipe, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method alkali solution method, high chemical grouting method and cement grouting method.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Pat Zun,Grand-Lahou,It is used to seal the construction joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.
share 5 Comments
Comment / Cancel reply