category:energy / date:2024-03-22 02:45:23 / browse:45 / comment:3

flame retardant and high resistance. Professional cold storage installation, cold storage installation, cold storage construction fruit preservation cold storage, medical cold storage and other special products, old brands, price advantages and guaranteed quality. Polyurethane is a flame retardant self extinguishing material after adding flame retardant. Its softening point can be above degrees Celsius and will only be decomposed at higher temperatures. In addition,ZabinkaWhich is cheaper to install in cold storage, the ash formed on the surface of polyurethane will be in its foam and this ash will help isolate the foam below. It can effectively prevent the spread of fire. Moreover, polyurethane will not produce harmful gas at high temperature.Watertight polyurethane rigid foam has low water absorption, good permeability to water vapor, and state of foam pores. It is not connected with each other, and the obturator rate is more than %. It is a dense microporous foam material, which is more dense than the surface of the air, and is not easy to permeate. It is an hydrophobic material.Zabinka, in the face of nature and for a long time, the condenser will be covered with a lot of dust and other foreign matters. These dust are firmly attached to the fins. If it is not handled manually, it is difficult to fall off. It can be diluted with cleaning agent according to a certain proportion, and evenly sprayed on the fins with a spray can. After waiting for minutes, it can be washed with clean water. If it is still not clean, the above can be repeated until the fins are clean.General quick-frozen warehouses are mostly cooled by refrigeration mechanisms, and those with very low gasification temperature are used as coolant to evaporate under low pressure and mechanical conditions, so as to absorb the heat in the warehouse, so as to achieve the purpose of cooling and reduction.Harstad,Large space rate of quick-frozen warehouse: for quick-frozen warehouses of the same size, reasonable design schemes store more goods than unreasonable ones. For the fixed size quick freezing warehouse,ZabinkaCold storage design and installation plant, how to design it to maximize its space rate is often an important problem considered by our designers. In the design scheme of Lukang medical quick-frozen warehouse, we reasonably designed to expand the original storage capacity of boxes to boxes, which increases the space a lot.For the ground insulation of large cold storage, we can that the ground insulation of medium-sized cold storage is more complex than that of small cold storage, and the ground insulation operation of large cold storage with larger warehouse area will be more complex. The common operations are as follows: first lay the ventilation pipe to prevent the ground from freezing drum cracking, then lay the XPS extruded plate (staggered laying is required when laying the extruded plate), then lay the moisture-proof and vapor barrier on the upper and lower sides of the extruded plate, then pour the reinforced concrete (generally at least cm thick), and then make the emery floor or epoxy floor according to the requirements. Among them, the XPS extruded plate is also laid according to the warehouse temperature. For example, the XPS extruded plate with thickness of ~ mm needs to be laid in the general low-temperature cold storage, while the XPS extruded plate with thickness of ~ mm can be laid in the high-temperature cold storage.There are two kinds of refrigeration in the cold storage group: immediate refrigeration and simple refrigeration.


ZabinkaHow much is the installation of large cold storageHow to choose



The machine room of ammonia refrigeration system shall be equipped with exhaust assembly; The exhaust fan shall adopt anti motor. When the power supply is cut off due to unexpected refrigeration, it shall be able to ensure the reliable power supply of the exhaust fan. The overload protection of the exhaust fan should be applied to the signal alarm system without directly stopping the exhaust fan. The button box of the exhaust fan shall be concealed in the wall outside the ammonia compressor room.Balance windows shall be provided for the fabricated controlled atmosphere storage.Energy saving and power saving: the design cost of quick freezing warehouse mentioned above is very low, but it has a great impact on the cost of quick freezing warehouse and later use cost. The electricity bill is often an important expenditure item in the later stage. The design scheme of the show can greatly reduce the power consumption of the quick freezing warehouse. The selection of the back sunny side of the quick freezing warehouse, the selection of the thickness of the thermal insulation board should be appropriate, and the temperature difference between the adjacent cold storage rooms should not be too large are all issues that we need to consider. There are also some tips, such as the use of air curtain machine on the quick freezing warehouse door. We remind users to use parallel units in quick freezing warehouse as far as possible and start them reasonably.system,The temperature and humidity in the warehouse shall be kept uniform without movement; Try to finish the food in the warehouse at one time.Polyurethane spraying is widely used in large and medium-sized refrigerators. Different well-known brands are produced at different prices and the product quality is relatively large. However, it is not high-quality or good goods. This is the result of long-term cooperation.The exhaust temperature of the compressor equipment is often. When the season changes and the temperature difference changes greatly, pay attention to it. If the machine is abnormal, it needs to be checked in time.


ZabinkaHow much is the installation of large cold storageHow to choose



Cold storage is mainly used for frozen processing and storage of foodRange, the end steel sheet at the overlap with the wall plate shall be disconnected for mm to prevent the cold bridge from running cold; Two layers of foaming materials shall be evenly and continuously punched on the joint surface between each top warehouse plate. Rivets shall be pulled and fixed at the internal and external lap joints of the steel plate and the wall plate should leave a gap for withdrawing construction equipment; During the installation of the top warehouse plate, and the rivet spacing shall be mm; According to the design drawings, if there are supporting beams, columns and supporting steel frames in the warehouse, the setting out and positioning shall be carried out and accurate and clear marks shall be made according to the requirements of the design drawings; Weld or install the support beam, column, support steel frame, etc., and the welded junction shall be moisture-proof and treated according to the drawing requirements.Pressure leak test: the system pressure leak test is the same as the blowdown work sample, which is required to be carried out by air compressor.The service life of the cold storage depends on the quality of the refrigeration equipment, but it also has a great relationship with the proper daily management and maintenance after the installation of the cold storage. Many times, people often ignore the latter point. In daily life, as long as we maintain and maintain the cold storage regularly, we can greatly improve the service life of the cold storage and reduce the cost.Zabinka,In order to maintain a constant low temperature in the cold storage, attention should be paid to the installation of cold storage panels in Guizhou: the floor, wall and flat roof of the cold storage are laid with a certain thickness of thermal insulation materials to reduce the incoming heat from the outside. In order to reduce the absorption of solar radiation, the surface of the external wall of the cold storage is painted white or light color. Therefore, cold storage building is different from general industrial and civil buildings,ZabinkaHow much does the cold storage cost to install, and has its unique structure. Cold storage buildings should prevent the entry of air and the diffusion of water vapor.The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.It is required to set up a special tally room (area), and the temperature of the tally area is usually controlled at ~ + ℃.

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

Comment area

share 3 Comments

user 695HP135175170 / 2024-03-22 10:04:05 / reply
The level of the seller MM is very high, and the people are very patient. I saw a lot of ZabinkaHow much is the installation of large cold storage, but I feel that you have the strength and bought yours. I didn’t expect it to be like this. Sellers like this are already online Rarely. I have asked a lot of sellers, but they can't do it, seller MM has done it. And the price is low. I am really happy.
user 224HP159430236 / 2024-03-22 10:50:36 / reply
I'm busy, I forgot, I'm sorry, what else can I say~~ This ZabinkaHow much is the installation of large cold storage is really good, lucky enough.
user 60HP184127502 / 2024-03-22 10:03:34 / reply
After looking for the ZabinkaHow much is the installation of large cold storage from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links