The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method,GinotepeSeamless pipe, double liquid silicification method, aerated silicification method and electric double liquid silicification method.
According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe, advance small conduit, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.The slurry stop plug used in the slurry stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good slurry stop plug shall ensure normal operation under the grouting pressure of more than MPa. According to its structure and action principle, the currently used slurry stopper can be divided into mechanical type and hydraulic type. Among them,GinotepeSteel pipe,2023-10-1315:00:45The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry and chemical slurry includes silicate (water glass) and high slurry. Silicification method,GinotepeGrouting pipe, high chemical grouting method and cement grouting method.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.
● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug mixer and other facilities in the hole.Ginotepe,Al Hazm,Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.
share 6 Comments
Comment / Cancel reply