category:Building materials / date:2023-05-10 01:11:22 / browse:190 / comment:4

The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding punching, stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, high strength, isotropy, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.The arrangement of the strain gauge shall be installed before the prestressing force is applied, and the bracket shall be fully cooled when the initial reading is measured; If the prestress has been applied, it must be noted in the report that the supporting axial force data reflects the change of the stress of the grouting pipe after the prestress is applied.San Antonio,Polymer chemical grouting method is applicable to reinforcement of sandy soil foundation, curtain grouting of dam foundation, water stop and leakage stoppage of underground engineering, reinforcement of muddy interlayer of dam foundation and fault fracture zone. There are many varieties of polymer chemical pulp materials, including epoxy resin, acrylamide (propionate), polyurethane (cyanogen), lignin, etc. Acrylamide and polyurethane are commonly used in chemical grouting of foundation. Acrylamide pulp is composed of main agent acrylamide and various admixtures. The viscosity of the slurry is close to water, and it has good groutability. After the slurry solidifies, the gel is impermeable, and has good durability and stability. This kind of slurry is widely used in seepage prevention grouting of fine rock cracks and medium fine sand layers and dynamic water leakage stoppage projects. This kind of pulp has certain toxicity and pollutes air and groundwater. The polyurethane slurry is mainly composed of polyisocyanate and polyether resin, and then mixed with various admixtures. After the slurry is poured into the formation, it reacts with water to form polyurethane foam, which can strengthen the foundation and prevent seepage and leakage. Polyurethane slurry can be divided into water-soluble and non-water-soluble. The water-soluble polyurethane can be miscible with water and react with water to form an aqueous gel; Water insoluble polyurethane can only be miscible with organic solvents. Polyurethane slurry has low viscosity, good groutability, high stone strength, safety and reliability, no pollution to the environment, simple operation and high economic benefits.If any crack is found, it shall be repaired in time, otherwise, when the joint is deformed and subjected to water pressure, the ability of the grouting pipe to resist external forces will be greatly reduced. When positioning the grouting pipe, it must be kept flat at the interface, and the grouting pipe must not be allowed to roll or kink. If it is found that there is no twist, it should be adjusted in time. When casting and fixing the grouting pipe, the deviation of the grouting pipe shall be prevented, so as not to shorten one side and affect the water stop effect. When pouring and tamping the concrete, it must be vibrated sufficiently to prevent the poor combination of the grouting pipe and the concrete from affecting the water stop effect. The grouting pipe joint must be well bonded. If the construction site conditions are available, the method of hot vulcanization connection can be used.?Arjona, It has good air tightness, low gas permeability, strong sealing and no leakage. The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.It is necessary to comprehensively consider the selection and configuration of grouting pipes, because there are many types of expansion joints, and correct selection is very important. Only in this way can the design of the piping system be safe, reasonable, reliable and economical.?


San AntonioDouble layer small conduit advance supportWhat is the delivery mode of



There are many forms of grouting pipes that can be improved and applied. Although the engineering pipeline system is very complex, any complex pipe system can be divided into several relatively simple individual pipe sections through the setting of fixed pipe racks. When selecting the corrugated grouting pipe, the deformation compensation of the pipe system can be determined according to these relatively simple pipe sections so as to select the grouting pipe. the polymer grouting materials of the machine are mainly applied to acrylamide, polyurethane, lignin, epoxy resin, unsaturated ester, etc. Generally, when the sand particle size is ≤ . mm or the rock crack opening is ≤ . mm, and the groundwater flow rate is > mm / min, the use of organic polymer chemical grouting materials can solve the engineering problems that cannot be solved by ordinary cement slurry [].The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, shaping coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.Safety production,The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value,San AntonioGrouting pipe, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile.Disposal method: the grouting pipe shall be shortened according to the specification. After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc.


San AntonioDouble layer small conduit advance supportWhat is the delivery mode of



The grouting pipe is used as the pipe for grouting at the bottom of the pile. The test shows that the bearing capacity of the cast-in-place pile treated with the pile bottom grouting can be greatly improved At the same time, the grouting pipe can also be used as the pipe for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch the pipe at the defect position where grouting is required. The classification of the grouting pipe can be divided into three categories according to the pipe materials: the advantages of steel pipe steel pipe are that it is easy to install, and it can be welded on the reinforcement frame by electric welding, which can replace part of the reinforcement section, and because of the large rigidity of the steel pipe After embedding, the parallelism and straightness can be basically maintained. At present, many large-diameter cast-in-place piles use steel as the grouting pipe. However the price of steel pipe is relatively expensive: steel corrugated pipe steel corrugated pipe is a better grouting pipe material. It has the characteristics of thin pipe wall, less steel,San AntonioSmall catheter, impermeability, pressure resistance,San AntonioLeading small conduit manufacturer, high strength and good flexibility. It is usually used for post tensioning reserved holes in prestressed structures: when used as grouting pipe. It can be directly bound to the reinforcement framework soil, and the joint can be connected with a larger corrugated sleeve. Since the bellows is light, it is very convenient to operate, but attention should be paid to keeping its axis straight during installation.query, change the cooperation specification of the mold, and adjust the cooperation space between the lower tire and the horseshoe.San Antonio,The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use. The cooperation Specification between the saddle profile on the horseshoe of the grouting pipe and the core is too low. When the outer mold and the horseshoe surface are fitted together, the gap is larger than the thickness of the pipe wall, that is, there is an active gap. Therefore, the Chengdu grouting pipe manufacturer kneads the pipe wall to form an 'eight' shaped wrinkle.The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, and the size matches the flange of the Christmas tree wellhead.


Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

 Articles that may be of interest

Comment area

share 4 Comments

user 416HP186602172 / 2023-05-10 08:22:58 / reply
San AntonioDouble layer small conduit advance support Not bad, the price is worth it, just right.
user 35HP162657470 / 2023-05-10 09:32:15 / reply
To live up to the boss's expectations of me, I will definitely write down my own evaluation objectively, fairly and truthfully, San AntonioDouble layer small conduit advance support is indeed very good, thank you!!!
user 122HP117294921 / 2023-05-10 09:57:35 / reply
Haha, I like it very much, like and cheer for the boss San AntonioDouble layer small conduit advance support
user 263HP145816628 / 2023-05-10 08:41:23 / reply
You San AntonioDouble layer small conduit advance support are okay, give a discount next time you buy, and buy your company's San AntonioDouble layer small conduit advance support

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links