category:Machinery and industry equipment / date:2023-05-09 03:47:57 / browse:121 / comment:3

Dry type transformer manufacturerUse fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.Bilina,The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing, remove and replace the cracked or brittle leather pad, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.Method and process of taking oil sample of power transformerLatina,Wiring mode of dry-type transformer:Due to poor sealing, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well, it will lead to common faults of oil leakage.Oil leakage at looper flange


BilinaDry type transformer temperatureComprehensive quality assurance



Wiring mode of dry-type transformer:Power saving analysis of transformers has always been based on whether the utilization rate of transformer capacity is less than a certain standard value. Whether transformers are environmental protection and energy saving specifications. In fact, sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.Potential development, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety,BilinaType of power transformer, otherwise it will have an adverse impact on life safety.


BilinaDry type transformer temperatureComprehensive quality assurance



The dry-type transformer is composed of two winding resistances, resulting in four wiring groups: & ldquo; y, Y & rdquo;,BilinaTransformer series, & ldquo; D, Y & rdquo;, & ldquo; y, D & rdquo; and & ldquo; D, D & rdquo;. In China, only & ldquo; y, Y & rdquo; and & ldquo; y,BilinaTransformer 500 box type, D & rdquo; are selected. Because there are also two types of Y-connection with neutral line and without neutral line. If there is no neutral line, when UAB and UAB overlap it will not be upgraded The letter N after the English letter Y indicates that the neutral line has transformer grounding wire. Yn wiring group, the minute hand points to . & ldquo; & rdquo; in the new wiring group it is indicated by & ldquo; & rdquo.Free consultation,Performance and main parameters of common metal composites various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.The top and middle of the transformer oil tank, the flange plate, barrel skin and the middle of the waterproof sleeve at the upper end of the automobile oil tank. The internal iron core and winding clamp are hot due to partial magnetic leakage, resulting in insulation damage.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of -A / Min.Bilina,What is the important role of power transformerIf the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, which is not suitable for too large or too small.Method and process of taking oil sample of power transformer

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

Comment area

share 3 Comments

user 122HP117294921 / 2023-05-09 11:16:45 / reply
The festival is coming soon, can BilinaDry type transformer temperature be discounted?
user 570HP155642700 / 2023-05-09 12:31:09 / reply
BilinaDry type transformer temperature The delivery is fast and the quality is good, but the logistics is a bit slow. Overall it is good, continue to support!
user 263HP145816628 / 2023-05-09 11:12:12 / reply
You BilinaDry type transformer temperature are good, is it convenient to place an order?

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links