Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)
The slurry stop plug used in the slurry stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good slurry stop plug shall ensure normal operation under the grouting pressure of more than MPa. According to its structure and action principle,PonceGrouting pipe, the currently used slurry stopper can be divided into mechanical type and hydraulic type. Among them, the mechanical slurry stopper is relatively simple and reliable and is widely used. - is several commonly used slurry stopper structures.After the grouting hole is drilled, install and lower the grouting pipe grout stop plug, mixer and other facilities in the hole.PoncePrecision tubeQuality test method,2023-12-0606:57:03● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.The secondary grouting pipe can only be grouted once and cannot be reused.
The grouting mechanism includes filling grouting, infiltration grouting,PonceSteel pipe,PoncePrecision tube, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, high chemical grouting method and cement grouting method.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Ponce,Wadi Musa,● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)
share 5 Comments
Comment / Cancel reply