The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method,AjaxSteel pipe, alkali solution method, high chemical grouting method and cement grouting method.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.
The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.The slurry stop plug used in the slurry stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good slurry stop plug shall ensure normal operation under the grouting pressure of more than MPa. According to its structure and action principle, the currently used slurry stopper can be divided into mechanical type and hydraulic type. Among them, the mechanical slurry stopper is relatively simple and reliable and is widely used. - is several commonly used slurry stopper structures.AjaxPrecision tubeThe social inventory gradually increased, and the manufacturer's output increased,2022-05-0603:36:38Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe high-pressure grouting pipe,AjaxSeamless pipe, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.The secondary grouting pipe can only be grouted once and cannot be reused.
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method,AjaxPrecision tube, remain at the hole bottom,Paso de los Libres so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.Ajax,The secondary grouting pipe can only be grouted once and cannot be reused.
share 6 Comments
Comment / Cancel reply