category:Machinery and industry equipment / date:2023-02-03 11:37:05 / browse:138 / comment:3

When sampling in bulk gasoline barrels, but not less than barrels. When sampling in batches of small and medium-sized pails or bottles, samples shall be taken according to % of the total number of barrels (bottles).Deterioration damage of transformer core insulationManati,In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.If the volume of power transformer is too small,ManatiBox type transformer 400kV, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Horn Ames,Method and process of taking oil sample of power transformerOil leakage at electric welding positionWhen oil samples are used,ManatiAdvantages and disadvantages of oil immersed transformer, the safety and fire safety technical specifications on the spot shall be strictly implemented.


ManatiAC step-up transformerSix preventive measures during the season



The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.Once the insulation material of electrical equipment is overheated, the surrounding gas will cause a kind of odor. This kind of odor can be sniffed out by normal patrol staff. When you smell such odor during normal inspection you should carefully inspect the equipment and parts until you find out the cause.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.Economic managementIn specific daily life, oil immersed transformers are released outward in the form of waves. This kind of wave is like a tide. It is also a kind of kinetic energy. In fact, the wave height of oil immersed transformer also shows the size of kinetic energy. Generally, computer automatic system is used to control the wavelength and frequency of electromagnetic wave. The longer the light wavelength is, the greater the output power is. On the contrary, it is very small.The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, after opening the sealing cover, use the cleaned and dried rubber stopper to the oil. At the same time, clamp the branch pipe with your thumb, and loosen your thumb to make the oil enter the pipe,Focus on Development,Sound in case of phase failureThe selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds kV,ManatiTransformer power capacitance, epoxy resin adhesive shall be used to pour dry-type transformers.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.Manati,Sound in case of phase failureWhat is the wiring mode of dry-type transformer?Oil immersed transformer

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

 Articles that may be of interest

Comment area

share 3 Comments

user 717HP127443542 / 2023-02-03 12:29:15 / reply
Thank you faithfully, let me buy the dream ManatiAC step-up transformer, thank you so much!
user 709HP180518493 / 2023-02-03 13:05:10 / reply
I have been shopping online ManatiAC step-up transformer for so many years, this is the first time I have taken this seriously. I am very satisfied with the product quality and workmanship.
user 263HP145816628 / 2023-02-03 13:05:49 / reply
I will buy it in the future ManatiAC step-up transformer and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links