because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the windingcategory:Machinery and industry equipment / date:2023-03-05 13:47:30 / browse:144 / comment:4
The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.Wells,WellsBox type transformer cabinet, sometimes such specifications are not saving electromagnetic energy, but consuming electromagnetic energy.Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, voltage transformation and blood pressure reduction must be carried out by the transformer.Power of La,If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore the rated capacity of the transformer should be selected according to the power consumption, the safety and fire safety technical specifications on the spot shall be strictly implemented.Oil leakage at looper flange
The power transformer conductor refers to the connecting transmission line between each electromagnetic coil which is not suitable for too large or too small.When oil samples are used, between the electromagnetic coil and the group outlet pipe, and between the electromagnetic coil and the tap changer.Maintenance contents of power transformerWhat about oil immersed transformer fire?Scheme customization,Falling foreign matters and piercingFrom the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;Due to poor sealing, generally, the sealing of box edge and machine cover is sealed with acid-base resistant rubber rod or rubber plate. If the joint is not solved well,WellsDifference between dry-type transformer and oil immersed transformer, it will lead to common faults of oil leakage.
Operation of oil immersed transformeranalysis,It includes the performance and main uses of insulating layer materials,Wells20kV power transformer, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.How to make up oil for oil immersed transformer?Oil immersed transformerWells,Method and process of taking oil sample of power transformerPower transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, chemical enterprises and factories.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.
share 4 Comments
Comment / Cancel reply