verify the water permeability of the rock stratumcategory:Electronic Component / date:2022-05-10 01:59:52 / browse:574 / comment:3
● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.The secondary grouting pipe can only be grouted once and cannot be reused.
According to the measured water absorption of the borehole, and provide professional quality assurance for grouting pipe steel flower pipe, advance small conduit, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.MonktonPrecision tubeThe market price fluctuated and weakened after the week was strong,2022-05-1002:01:42The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.It is used to seal the construction joints,MonktonGrouting pipe, cold joints,MonktonSteel pipe, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, steel flower pipe, advance small pipe, pipe shed pipe, grouting pipe factory old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.
The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.Monkton,West Jerusalem,Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory,MonktonPrecision tube, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.
share 3 Comments
Comment / Cancel reply