Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Dry type transformer manufacturerBorjega,Power saving analysis of transformerSound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.TokatThe scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes machinery and equipment of each process flow; The natural working environment is basically regulated.The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.
The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition, we should also pay attention to the following aspects.The key reason for oil leakage is that there are defects in cast iron partsWork courses, and the transformer will turn to all normal operation.For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage,BorjegaTransformer point, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.The insulation distance between the winding and the iron yoke of power transformer is much larger than that between the windings, because the electric field between the winding and the iron yoke is far away and not as symmetrical as that between the windings. In the electric field in the middle of the winding, most of the cables are in phase with the insulating cylinder (plate) in the middle of the winding, that is, the disconnection component of the electric field is small.
Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.device management,The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils,BorjegaDry type transformer 1250kva, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.In order to promote the use of energy-saving transformers the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).Borjega,After no-load test run is normal for h, and the load shall be gradually increased from %, % and % by grade.There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.The flange surface is uneven, the tightening bolts are loose,BorjegaLow voltage oil immersed transformer, and the installation and processing process is wrong, so that the bolts are not tightened well, resulting in oil leakage.
share 5 Comments
Comment / Cancel reply