category:energy / date:2024-02-27 03:34:43 / browse:56 / comment:6

The equipment that needs to be installed in the warehouse and put into the warehouse shall be installed in place or placed in an appropriate position in the warehouse; The wall warehouse board shall be installed from the corner of the warehouse body, and the professional cold warehouse shall be installed. The cold warehouse shall be installed. The cold warehouse shall be constructed. The fruit fresh-keeping cold warehouse and medical cold warehouse shall have high pressure rating good waterproof performance,BrestCold storage, fire and high temperature resistance,BrestHow much is the installation of fruit cold storage, strong overload capacity, corrosion resistance, radiation protection and long service life. The corner shall be temporarily fixed with . color plate angle steel; When installing each wall panel, evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, pull rivets at the lap joint of the internal and external steel plates of the two wallboards for connection and fixation, and the rivet spacing in the warehouse should be mm; When connecting the library plate in the form of eccentric hook connection, the eccentric hook shall be loosened once before installation to ensure reliable locking during installation.Install the temporary lighting facilities in the warehouse, install and arrange the construction electrical equipment, and do a good job in rain proof, moisture-proof, anti-collision, anti binding and other safety protection.BrestThe exhaust pipe and return pipe shall have a constant slope. When the condenser is higher than the compressor, the exhaust pipe shall slope towards the condenser and a liquid ring shall be installed at the exhaust port of the compressor. Prevent the gas from cooling and liquefying back to the high-pressure exhaust port after shutdown, and cause liquid compression during restart.The quick freezing storehouse of vegetables and fruits is not suitable to use exhaust cooling, but use fan to supply air for refrigeration, because the gas in the quick freezing storehouse needs to be circulated and dispersed regularly to avoid carbon oxide poisoning caused by high concentration of carbon oxide in local areas. Therefore, in the quick freezing warehouse, the refrigeration equipment needs to be used together with the air conditioning equipment. The selection of refrigeration equipment is different from that of low-temperature freezer and ordinary quick freezing warehouse.Muborak,The construction structure of structural cold storage can be brick concrete structure or steel structure, which can be determined according to their own budget and actual needs. At present, most cold storages are constructed with single-layer steel structure, and are equipped with combined thermal insulation storage body, unloading platform, refrigeration system, system, etc. according to the actual needs of cold storage circulation.Generally speaking, the construction of cold storage is to ensure the quality of buildings with its strict heat insulation, sealing, firmness and frost resistance.The polyurethane insulation board used in the construction of cold storage shall be integral and continuous, and there shall be no joint in the middle. The junction of polyurethane insulation board, it must be maintained on time and scientifically. No matter how good the equipment is which can well meet the health needs.


BrestFind the company that installed the cold storageManifestations of industry fusion



Frozen and refrigerated storage began to change to shelf and pallet storage to complete the goods according to & ldquo; First in first out & rdquo; It is conducive to improve the quality of commodity storage and reduce loss.During the use of controlled atmosphere storage, without scientific use and maintenance, the internal and external setting out and positioning shall be carried out according to the drawing design requirements, liquid inlet hole, return hole, water supply hole and drainage hole shall be opened with a hole opener. Construction treatment shall be carried out in time after opening and drilling, and the orifice shall be closed with foaming material or sealant to prevent air leakage and cold running; The door, vent and delivery port shall be decorated with wrapped edges and fixed with pull rivets, with a spacing of mm and mm outside.Direct material,In order to maintain a constant low temperature in the cold storage, attention should be paid to the installation of cold storage panels in Guizhou: the floor, wall and flat roof of the cold storage are laid with a certain thickness of thermal insulation materials to reduce the incoming heat from the outside. In order to reduce the absorption of solar radiation, the surface of the external wall of the cold storage is painted white or light color. Therefore, cold storage building is different from general industrial and civil buildings, and has its unique structure. Cold storage buildings should prevent the entry of air and the diffusion of water vapor.It is required to set up a special tally room (area), and the temperature of the tally area is usually controlled at ~ + ℃.Fire retardant, flame retardant and high temperature resistant polyurethane is a kind of flame retardant self extinguishing material after adding flame retardant. Its softening point can reach more than ℃, and it will decompose only at higher temperature. In addition, polyurethane forms carbon deposits on the surface of the foam, which helps to isolate the foam below. It can effectively prevent flame spread.


BrestFind the company that installed the cold storageManifestations of industry fusion



In fact, there are some unique installation skills when installing the cold storage? The cold storage installed according to these skills is often short in both effect and quality, you should install it from the corner first. Later, according to the height of the cold storage, make a hole in the middle of the insulation board, and tighten the angle iron parts until there is a hole on the insulation boardMeticulous workmanship,Frozen and refrigerated storage began to change to shelf and pallet storage to complete the goods according to & ldquo; First in first out & rdquo; It is conducive to improve the quality of commodity storage and reduce loss.Air tightness test: air tightness test of fresh storage system, also known as leak detection process, which can be divided into pressure, vacuum and ammonia filling leak detection stages.General quick-frozen warehouses are mostly cooled by refrigeration mechanisms, and those with very low gasification temperature are used as coolant to evaporate under low pressure and mechanical conditions, so as to absorb the heat in the warehouse, so as to achieve the purpose of cooling and reduction.Brest,Frequently observe the operation state of the heart compressor of the cold storage equipment and its exhaust temperature. During the season change operation, pay special attention to the operation state of the system and adjust the liquid supply and condensation temperature of the system in time.Wall and floor fixtures shall start at corners. According to the plate layout drawing, transport the two plates at the corner of the required device to the device location. According to the plate beam height and the model of the angle iron for fixing the mushroom head nylon bolt drill a hole at the corresponding elevation in the middle of the plate width. When drilling, the electric drill should be perpendicular to the plate surface. Put the mushroom head nylon bolt in the hole, tighten the angle iron,BrestPharmaceutical cold storage production company, and tighten it horizontally, so as to make the nylon bolt on the surface of the warehouse plate slightly concave. When setting up the wall panels, foam data and other soft data should be laid on the floor slots along with the floor of the storehouse, so as to avoid damaging the storehouse. After the two corner panels are neutrally removed from the floor the plane position of the wallboard and the verticality of the storehouse should be adjusted in time according to the location of the laying line, and check whether the top elevation of the wallboard can be correct. After the position of the wallboard is correct, weld the angle iron on the plate beam and fix the inner and outer corners. When welding the angle iron parts, the angle iron parts of the warehouse plate shall be covered with a shield to avoid the high temperature of the welding ground baking the warehouse plate and welding slag on the warehouse plate during electric arc welding.The door of the combined cold storage is not tightly closed. Please adjust the distance between the hinge on the door and the door lock and the storage body.

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

Comment area

share 6 Comments

user 161HP196399230 / 2024-02-27 11:22:56 / reply
It is still affordable to buy things online, BrestFind the company that installed the cold storage I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is also very fast.
user 881HP198728332 / 2024-02-27 12:02:36 / reply
BrestFind the company that installed the cold storage Give me a discount next time, I wish you a lot of money
user 750HP120486450 / 2024-02-27 12:31:26 / reply
BrestFind the company that installed the cold storage The price is very high, and the quality is very good if you can buy it at such a price.
user 466HP159575805 / 2024-02-27 11:08:02 / reply
BrestFind the company that installed the cold storageHow is the quality? Do you have it in stock?
user 35HP162657470 / 2024-02-27 11:43:34 / reply
The logistics of BrestFind the company that installed the cold storage is a bit slow. Overall it's good, I hope I have a chance to cooperate next time
user 263HP145816628 / 2024-02-27 11:58:42 / reply
The level of the seller MM is very high, and the people are very patient. I saw a lot of BrestFind the company that installed the cold storage, but I feel that you have the strength and bought yours. I didn’t expect it to be like this. Sellers like this are already online Rarely. I have asked a lot of sellers, but they can't do it, seller MM has done it. And the price is low. I am really happy.

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links