category:Electronic Component / date:2023-02-15 09:24:14 / browse:183 / comment:4
Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, strengthen and correct the deflection of buildings.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.
Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section, and its main purpose is to check the slurry stop effect of the slurry stop pipe head,San Lucas Sacatepéquez Grouting pipe, especially the slurry stop plug.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.San Lucas Sacatepéquez Steel pipeCredit guarantee,2023-02-1509:24:14● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe ccll-d full section grouting pipe)● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe,San Lucas Sacatepéquez Seamless pipe, ccll-d full section grouting pipe)
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method,San Lucas Sacatepéquez Precision tube, aerated silicification method and electric double liquid silicification method.After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.San Lucas Sacatepéquez ,San-Antonio,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method aerated silicification method and electric double liquid silicification method.
share 4 Comments
Comment / Cancel reply