The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end, which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.The grouting pipe without shaft roll packaging is tapped and paid off from the inner ring in the vertical state, and the drawn out pipe is spring shaped and automatically straightened. Takeout direction: the spiral direction of the spring shape after takeout is consistent with the twisting direction of, otherwise fried dough twist or disorder will occur. Welding is strictly prohibited during use, because the strength of the welding point is much lower than that of the steel itself, and it is easy to cause broken wires at the welding point during tensioning. When the grouting pipe adopts circular reinforcement arrangement, its bending radius shall not be less than times of the diameter.NATO grams, The grouting pipe has good flexibility. When the pipe is produced, it can be coiled, so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?Alausi, and the convex grooves are equipped with sealing rings. During installation, the spigot end of the product is stabbed into the bell end. The grouting pipe then kneads the two convex grooves together with a special hydraulic clamp, and the pipe at the kneaded part is shortened and deformed after being stressed. The outer pipe between the two convex grooves is deeply embedded into the inner pipe, and then the connection of the product is completed; After being kneaded, a rubber sealing ring is deformed and pasted between two layers of pipes, which plays a double safety sealing effect. The saddle shaped curved surface on the horseshoe surface of the grouting pipe and the upper and outer molds are not well fitted, which is caused by the Chengdu grouting pipe manufacturer&#;s failure to smooth (flatten) the grouting pipe along the horseshoe surface.


NATO gramsGrouting small conduit and advance anchor rodWhat should I pay attention to when using



In limestone area, the punching is not good and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, and using a drill with a small drill to clean the hole.[] Middle label: refers to flange, refers to fixed cutting device, refers to tightening blade device, refers to tightening blade nut, refers to cutting rotating device, refers to cutting blade, refers to pulley and refers to bearing.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile,NATO gramsSmall catheter, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceresources,Can the piston rod of the grouting pipe be protected to avoid being bruised and accelerating leakage?The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced but the cement slurry injected for the first time must be discharged to avoid gas between the two grouts. After the holes are filled and the exhaust holes are closed, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors,NATO gramsGrouting seamless pipe, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust,NATO gramsHollow self-propelled anchor rod manufacturer, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, because there are many types of expansion joints, and correct selection is very important. Only in this way can the design of the piping system be safe, reasonable, reliable and economical.?


NATO gramsGrouting small conduit and advance anchor rodWhat should I pay attention to when using



It is safe and does not need to be welded on site.system,In limestone area, the punching is not good, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole.After the sodium hydroxide solution is poured in, the calcium chloride solution is poured in, which is called the two liquid method. Alkali solution method has the advantages of simple construction equipment, low reinforcement cost, and elimination of collapsibility of loess.The main elastic element of the grouting pipe is the stainless steel grouting pipe, which compensates the axial, lateral and angular direction of the pipe by the expansion and bending of the grouting pipe.NATO grams, The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.The stability of the grouting pipe is one of the important factors to control the stability of the whole foundation pit. Its erection must be accurate and in place, and prestress must be applied in strict accordance with the design requirements. In particular attention should be paid to the stability of the diagonal bracing. During the diagonal bracing operation, the steel purlin must also ensure its stability, strength and deformation requirements during the production and installation process. In addition, During the whole construction process from foundation pit grouting pipe erection to removal, the grouting pipe must be strictly monitored to ensure its stability. How to improve the bearing capacity of piles with grouting pipes in bored piles, during the drilling process of large-diameter cast-in-place piles, the soil layer around the piles will become loose due to the agitation of the turning heads. In addition, the water immersion makes the soil layer that has started to loosen more loose. This problem can be effectively solved by grouting with grouting pipes. How to improve the bearing capacity of piles when grouting with grouting pipes? The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

 Articles that may be of interest

Comment area

share 4 Comments

user 965HP113924865 / 2023-01-28 11:48:06 / reply
I want to change a supplier and see you on the Internet, can I give a detailed explanation NATO gramsGrouting small conduit and advance anchor rod
user 416HP186602172 / 2023-01-28 11:57:28 / reply
Great NATO gramsGrouting small conduit and advance anchor rod, very good service, thank you.
user 35HP162657470 / 2023-01-28 12:18:39 / reply
Good seller, thank you. My colleagues like NATO gramsGrouting small conduit and advance anchor rod very much. Come again next time!
user 709HP180518493 / 2023-01-28 11:54:07 / reply
After my personal experience, the reputation of this store is quite good. NATO gramsGrouting small conduit and advance anchor rod The quality is more like a diamond. Thank you so much!

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links