The grouting mechanism includes filling grouting, and chemical slurry includes silicate (water glass) and high slurry. Silicification method compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, alkali solution method, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service, stop leakage,Iron energyGrouting pipe, strengthen and correct the deflection of buildings.
According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe,Iron energyPrecision tube, advance small conduit, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe advance small conduit, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities new and old customers are welcome to consult to determine the grouting pressure and flow,Iron energySteel pipe, and determine the grouting slurry and its initial concentration.Iron energySeamless pipeSino US trade friction heats up and prices fluctuate,2024-04-0302:18:18● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.Iron energy,Giyon,The secondary grouting pipe can only be grouted once and cannot be reused.
share 6 Comments
Comment / Cancel reply