category:Electronic Component / date:2023-10-09 12:07:42 / browse:109 / comment:6

It is used to seal the construction joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory,ElvioSeamless pipe, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.

ElvioSeamless pipeRRR reduction is a timely help to the industry


The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious thin mud slurry can also be used as circulating fluid.After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug,ElvioGrouting pipe, mixer and other facilities in the hole.ElvioSeamless pipeRRR reduction is a timely help to the industry,2023-10-0912:07:42It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry,ElvioPrecision tube, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.

ElvioSeamless pipeRRR reduction is a timely help to the industry


It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint, pipe leakage and the joint between the ground wall.The grouting equipment grouting pump and the lowered grouting pipe are connected for grouting, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section, move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.Elvio,Bhimbar, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

Comment area

share 6 Comments

user 750HP120486450 / 2023-10-09 13:52:20 / reply
To live up to the boss's expectations of me, I will definitely write down my own evaluation objectively, fairly and truthfully, ElvioSeamless pipe is indeed very good, thank you!!!
user 47HP158935852 / 2023-10-09 12:55:25 / reply
ElvioSeamless pipe The delivery is fast and the quality is good, but the logistics is a bit slow. Overall it is good, continue to support!
user 391HP142030639 / 2023-10-09 13:04:34 / reply
ElvioSeamless pipeYes, give you a good comment
user 416HP186602172 / 2023-10-09 13:58:30 / reply
I want to change a supplier and see you on the Internet, can I give a detailed explanation ElvioSeamless pipe
user 984HP143755493 / 2023-10-09 12:45:19 / reply
ElvioSeamless pipe It’s good, the price is right, friends also say it’s good, it’s worth it
user 709HP180518493 / 2023-10-09 12:29:58 / reply
ElvioSeamless pipe Tell me a price, is there a detailed price for the parameter?

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links