category:Machinery and industry equipment / date:2022-12-24 13:13:31 / browse:166 / comment:4

first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.Bad Ischl,After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).San Miguel de SalcedoThe key reason for oil leakage is that there are defects in cast iron partsOutdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.Deterioration damage of transformer core insulation


Bad IschlVarious transformersDoes the deformation affect the effect?



High voltage fuse of transformer breaks one phase;Power saving analysis of transformerPerformance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.Create brilliance,The oil in the machinery and equipment of the oil storage tank shall generally stand for more than h before sampling; it is not necessary to stand when sampling on the running power transformer.Oil leakage of porcelain pot and laminated glass oil level gaugeSound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.


Bad IschlVarious transformersDoes the deformation affect the effect?



When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Trustworthy,Dry type transformer manufacturerIn order to promote the use of energy-saving transformers, the Ministry of finance, the Ministry of industry and information technology and the national development and Reform Commission jointly promulgated the detailed rules for the implementation of energy-saving distribution transformers of energy-saving products benefiting the people project as early as , providing subsidies of - yuan / KVA for energy-saving transformers.When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:Bad IschlThe flange surface is uneven, the tightening bolts are loose, and the installation and processing process is wrong, resulting in oil leakage.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain,Bad IschlBox type transformer,Bad IschlDry type transformer equipment,Bad IschlPrice of 800 KVA dry type box transformer, wind and sand.Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

 Articles that may be of interest

Comment area

share 4 Comments

user 965HP113924865 / 2022-12-24 14:56:37 / reply
The logistics of Bad IschlVarious transformers is a bit slow. Overall it's good, I hope I have a chance to cooperate next time
user 416HP186602172 / 2022-12-24 14:49:47 / reply
Bad IschlVarious transformersHow much is the best price, and I will give you a comment, can Bad IschlVarious transformers be cheaper?
user 35HP162657470 / 2022-12-24 14:05:59 / reply
Just paid, when will Bad IschlVarious transformers arrive, boss.
user 984HP143755493 / 2022-12-24 13:54:09 / reply
Now the business is not easy to do, can you give more discounts?

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links