category:energy / date:2024-06-08 02:12:35 / browse:62 / comment:3

The butt joint between the top warehouse plate and the end of the top warehouse plate shall be treated to prevent air leakage and cold running. After all the top warehouse plates are installed, the butt joint shall be filled with foaming material, and the mm wide color steel plate shall be sealed at the butt joint with pull riveting.The overall construction achievements of the cold storage project have been put into use, and the service life can reach years.Croatia,After the welding of the whole system, the air tightness test shall be carried out, and the high-pressure end shall be filled with mp nitrogen. Nitrogen charging MP at low pressure end. During pressurization, conduct leak detection with soapy water, and carefully inspect all welded junctions, flanges and valves, so as to keep the pressure from falling off after the completion of simplicity.Fire retardant, flame retardant and high temperature resistant polyurethane is a kind of flame retardant self extinguishing material after adding flame retardant. Its softening point can reach more than ℃, and it will decompose only at higher temperature. In addition, polyurethane forms carbon deposits on the surface of the foam which helps to isolate the foam below. It can effectively prevent flame spread.Poza-Rica-de-Hidalgo,CroatiaCold storage installation engineering company,The installation of cold storage board is a link of the cold storage installation project. High price cold storage installation of various specifications, cold storage construction, fruit preservation cold storage, medical cold storage. Waste merchants, industry,CroatiaHow much is the general cold storage installation, enterprises and power departments are welcome to visit and negotiate! The cold storage body and storage plate include: floor, vertical plate and ceiling plate. The installation of storage plates in different directions and precautions are as follows: enter the construction site verify the construction situation according to the construction drawings, determine the equipment installation position, and then refer to the following specifications.For the flushing (thawing) drainage pipe in the cold room with different temperature, an exhaust valve equipment shall be set before connecting the flushing (thawing) drainage pipe.Reasonably adjust the cold storage evaporator and defrost in time: Generally speaking, every ℃ increase in the evaporation temperature of the cold storage can save energy by ~ . Therefore, on the premise of meeting the refrigeration process of the product, the liquid supply can be adjusted to increase the evaporation temperature as much as possible.


CroatiaInstallation of small cold storageReasons for the increase in production



The equipment is built according to the application requirements of low-temperature distribution. It is reflected in the following points: a low-temperature hall, a closed platform, an electric sliding refrigerated door, an anti-collision flexible seal, and a platform height conditioning equipment (lifting channel) are built to complete & ldquo; Door to door & rdquo; Type loading and unloading operation has become a symbol of modern cold storage.After startup, first listen to whether the sound of the compressor is normal, and see whether the condenser and cooling fan operate normally.The common phenomenon of quick freezing storehouse is that the temperature of quick freezing storehouse can't drop down or drops slowly. Now, a simple analysis is made on the reasons for the slow drop of temperature: the cold capacity loss of quick freezing storehouse is large due to poor thermal insulation or sealing performance; the poor thermal insulation performance is due to insufficient thickness of thermal insulation layer of pipeline and warehouse thermal insulation wall, resulting in poor thermal insulation and thermal insulation effect, It is mainly caused by improper selection of insulation layer thickness in design or poor quality of insulation materials in construction.Design brand,The equipment that needs to be installed in the warehouse and put into the warehouse shall be installed in place or placed in an appropriate position in the warehouse; The wall warehouse board shall be installed from the corner of the warehouse body, good waterproof performance, fire and high temperature resistance, strong overload capacity, corrosion resistance, radiation protection and long service life. The corner shall be temporarily fixed with . color plate angle steel; When installing each wall panel, evenly apply two layers of foaming material on the joint surface of male and female groove, and apply one layer of foaming material when installing polystyrene wall panel. The blanking shall be uniform and continuous; After the wallboard is installed in place, pull rivets at the lap joint of the internal and external steel plates of the two wallboards for connection and fixation, and the rivet spacing in the warehouse should be mm; When connecting the library plate in the form of eccentric hook connection, the eccentric hook shall be loosened once before installation to ensure reliable locking during installation.The construction of cold storage in site selection bears the circulation of low-temperature goods. Therefore, the transportation convenience of cold storage construction site should be given priority in site selection, such as proximity to roads railways, the location of the cold storage should avoid large pollution sources and direct sunlight, and the construction of the cold storage should have good drainage and ventilation conditions.The ultrasonic town is a patented technology with a shaped energy cover, which increases the effective humidification amount by -% per hour. What are the reasonable aspects of the design of the quick freezing warehouse?


CroatiaInstallation of small cold storageReasons for the increase in production



Large space rate of quick-frozen warehouse: for quick-frozen warehouses of the same size, reasonable design schemes store more goods than unreasonable ones. For the fixed size quick freezing warehouse, how to design it to maximize its space rate is often an important problem considered by our designers. In the design scheme of Lukang medical quick-frozen warehouse, we reasonably designed to expand the original storage capacity of boxes to boxes, which increases the space a lot.packing,These are several very common cold storage materials. The use of these materials has greatly improved the thermal insulation and refrigeration performance of the cold storage, which makes people's retained items more convenient and reliable. With the continuous development of material technology, today's various cold storage materials emerge in endlessly and the cold storage is different from each other. When purchasing, we should make reasonable comparison and select products suitable for our own use needs and economic conditions.The air conditioning warehouse is equipped with standby power supply. After eliminating the line and load problems, Automatically switch the generator set for power generation after power failure for use. For example, dual mains power can be used.Compression refrigerator is commonly used, which is mainly composed of compressor, condenser, throttle valve and evaporation pipe. According to the way of evaporation pipe device, it can be divided into direct cooling and indirect cooling. Direct cooling the evaporation pipe is installed in the refrigerated warehouse. When the liquid coolant passes through the evaporation pipe, it will directly absorb the heat in the warehouse and cool down.Croatia,CroatiaInstallation cost of fresh-keeping cold storage,During the use of cold storage, attention shall be paid to the collision and scratch of the storage body to avoid the depression and corrosion of the storage plate, which will seriously reduce the local thermal insulation performance of the storage body.The installation of cold storage board is a link of the cold storage installation project. High price cold storage installation of various specifications, cold storage installation, cold storage construction, fruit preservation cold storage medical cold storage. Waste merchants, industry, enterprises and power departments are welcome to visit and negotiate! The cold storage body and storage plate include: floor, vertical plate and ceiling plate. The installation of storage plates in different directions and precautions are as follows: enter the construction site, verify the construction situation according to the construction drawings, determine the equipment installation position, and then refer to the following specifications.Compression refrigerator is commonly used. It is mainly composed of compressor, condenser, throttle valve and evaporation pipe. The evaporation pipe is installed in the refrigeration warehouse. When the liquid coolant passes through the evaporation pipe, it directly absorbs the heat in the warehouse and cools down.

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

 Articles that may be of interest

Comment area

share 3 Comments

user 237HP184976196 / 2024-06-08 11:03:50 / reply
Buying things online is about integrity, and you do it! Thank you CroatiaInstallation of small cold storage Like one Fast delivery, very good attitude, very satisfied! very good!
user 60HP184127502 / 2024-06-08 09:45:03 / reply
It is very comfortable to do business with you. Responsible, serious, CroatiaInstallation of small cold storage is also good, I must give you a good comment. Looking forward to the next cooperation, I wish Rijin Doujin!
user 35HP162657470 / 2024-06-08 09:34:25 / reply
Just received the goods, very good, CroatiaInstallation of small cold storage great value for money! ! Come in the future!

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links