Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.
The slurry stop plug used in the slurry stop plug grouting method is the key device to seal the grouting borehole and realize segmented grouting. A good slurry stop plug shall ensure normal operation under the grouting pressure of more than MPa. According to its structure and action principle, the mechanical slurry stopper is relatively simple and reliable and is widely used. - is several commonly used slurry stopper structures.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.librarySteel pipeLow inventory and strong price rising sentiment of traders, double liquid silicification method aerated silicification method and electric double liquid silicification method.
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.library,Hua Hin,Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe,libraryGrouting pipe,librarySeamless pipe, high-pressure grouting pipe,libraryPrecision tube, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage
share 6 Comments
Comment / Cancel reply