Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe,San RamonSeamless pipe,San RamonGrouting pipe, high-pressure grouting pipe, pipe shed pipe grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.
Push the rock powder and sundries that are not washed, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.Compared with sleeve valve pipe grouting method, the common disadvantages of grouting pipe grouting method, flower pipe grouting method and drill pipe grouting method are that it is easy to emit slurry along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using slurry with good fluidity and long initial setting time; The utility model has the advantages of simple equipment and process, and is more suitable for situations requiring rapid response.San RamonGrouting pipePrices continued to be weak and market performance was chaotic fast construction speed,2022-07-1505:21:10Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method,San RamonSteel pipe, double liquid silicification method, aerated silicification method and electric double liquid silicification method.The secondary grouting pipe can only be grouted once and cannot be reused.
The secondary grouting pipe can only be grouted once and cannot be reused.Compared with sleeve valve pipe grouting method, the common disadvantages of grouting pipe grouting method, flower pipe grouting method and drill pipe grouting method are that it is easy to emit slurry along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using slurry with good fluidity and long initial setting time; The utility model has the advantages of simple equipment and process, good flexibility, fast construction speed, and is more suitable for situations requiring rapid response.San Ramon,Zakho,● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.
share 6 Comments
Comment / Cancel reply