category:Machinery and industry equipment / date:2023-03-20 01:45:26 / browse:146 / comment:4

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding,SipingThree phase transformer 100kW, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Noise solution of dry-type transformerSiping,Accurately measure the resistance of each phase winding and carry out the measurement. If there is a great difference, it is a common fault of the winding. Then carry out the appearance inspection of the iron core, and then accurately measure the inter chip insulation resistor by AC voltage and galvanometer method. If the damage is not large, paint the damaged part.Common problems of tap changer of power transformerNegotino, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover,Siping800 box type transformer, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover,SipingDry type transformer 1250kva, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, the cost of energy-saving transformers is significantly higher than that of traditional transformers, and the price factor is also a key factor endangering the popularization and marketing of energy-saving transformers. Although there are energy-saving and convenient subsidy projects to help energy-saving transformers, the market has not yet fully operated.How to reduce the failure of dry-type transformer?Test conclusion,In the case of dry-type transformer operation, there is more noise and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.The noise of dry-type transformer comes fromThe long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.


SipingOil type transformer structureWhat should be paid attention to at work



With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.packing,(I) the distance between the external contour of kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than m; At the angle with actual operation, a spacing of more than m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.According to statistics, to occupy the main global technical position, the transformer industry depends on two key data, commodity volume and voltage level. As early as & ldquo; Eleventh Five Year Plan; In the early stage, China has been a powerful country in the production, manufacturing and application of dry-type transformers all over the world but it is not a big country.What is the wiring mode of dry-type transformer?Siping,Operation and maintenance management of oil immersed transformerIn terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

 Articles that may be of interest

Comment area

share 4 Comments

user 466HP159575805 / 2023-03-20 09:30:26 / reply
Every time I receive the goods is very pleasant, but as long as I think of evaluating it, my head is big. Fortunately, a omnipotent friend recommended your home SipingOil type transformer structure, the price is good, the quality is good, the delivery is good, and the boss is good.
user 984HP143755493 / 2023-03-20 10:36:57 / reply
The logistics of SipingOil type transformer structure is a bit slow. Overall it's good, I hope I have a chance to cooperate next time
user 570HP155642700 / 2023-03-20 09:29:48 / reply
SipingOil type transformer structure How much is the minimum, can it be wholesale
user 409HP184720764 / 2023-03-20 09:42:24 / reply
SipingOil type transformer structure The quality is very good, I bought it for the second time, the goods are good, the boss is very good

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links