category:Electronic Component / date:2022-05-17 11:15:18 / browse:571 / comment:4

Red deerSteel pipe,

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method aerated silicification method and electric double liquid silicification method.Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up, the pipe core and the outer wall of the pipe shall be washed clean.

Red deerGrouting pipePrecautions for installation operation


A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it is used to install orifice closure device to prevent slurry leakage.Compared with sleeve valve pipe grouting method, the common disadvantages of grouting pipe grouting method,Red deerSeamless pipe, flower pipe grouting method and drill pipe grouting method are that it is easy to emit slurry along the pipe wall and the grouting layering effect is poor. These disadvantages are particularly prominent when using slurry with good fluidity and long initial setting time; The utility model has the advantages of simple equipment and process, good flexibility, fast construction speed, and is more suitable for situations requiring rapid response.Red deerGrouting pipePrecautions for installation operation,2022-05-1711:17:59● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)

Red deerGrouting pipePrecautions for installation operation


The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, alkali solution method, high chemical grouting method and cement grouting method.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Red deer,Red deerGrouting pipe,Jayapura,Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method aerated silicification method and electric double liquid silicification method.

Copyright Notice: This article is not authorized by any Creative Commons agreement, you can freely reprint or use it in any form

Comment area

share 4 Comments

user 35HP162657470 / 2022-05-17 13:12:11 / reply
Haha, Red deerGrouting pipe received! It's too late to confirm, sorry, the boss is very fashionable!
user 122HP117294921 / 2022-05-17 12:58:05 / reply
Happy cooperation and tight packaging. Let’s talk about business services: Like
user 632HP195506591 / 2022-05-17 13:11:02 / reply
Really a good seller. I have to find you if I have this Red deerGrouting pipe demand in the future!
user 709HP180518493 / 2022-05-17 11:19:19 / reply
I will buy it in the future Red deerGrouting pipe and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!

Comment / Cancel reply

Required

Optional

Optional

◎Welcome to discuss, please express your views here.

Hello, welcome to this website!

Label list

Links